There's not a lot you really want to do in the rain so we decided that we should go and have a day on the build before we go to Plovdiv tomorrow.
I must say Sally has amazed me she has been a star today, she has just got stuck in with no complaints even though it's rained again all day and she has had to trip back and forth to the garage emptying out the ground floor of the house which believe me was no easy job.
I kept myself busy taking down the hall ceiling which took quite a lot of time, there again I didn't expect it to be made of clay and straw and be in places 6 inches thick.
I estimate by the amount of waste that there was probably at least a tonne of materials in the hall ceiling which is barely 8ft square.
We had our first visitor "Baba Penka" who popped in around late afternoon and proper hit it off with Sally even though we don't have a clue what she said.
This is the woman that kept an eye on the house for the previous owner Daniella
Anyway we decided that we had done enough for one day and with that the sun come out for a while so we finished for the day and went back to the hotel for a shower before going for a walk and a drink in Lovech Town.
Having a great time the food is fab and the people are lovely, tomorrow we get to be proper tourists in Plovdiv.
Empty Basement thanks to Sally |
Sally "loving it" |
Hall ceiling is no more |
No comments:
Post a Comment